Rigging Formulas Pdf

Always consider the sling angle when making a lift. The angle of the sling can reduce the capacity of all the rigging due to sling tension. As an example, a. Load Chart & Rigging LEARNING GUIDE Mobile Hydraulic – 80 Tonnes & Under Tadano RT GR-600XL-1 (1) www.fulford.ca CraneSafe Certification + Fulford Harbour Group LCR3 These charts are for assessment purposes only and should not be used to operate a crane.

Rigging math • 1. Rigging MathCalculating our WLL from catalog WLL • BasicallyWLL=UL(d) • BasicallyWorking Load Limit Design Factor WLL=UL(d) Ultimate Load • But More LikeWorking Load Limit Design Factor WLL=UL(d)(e) Ultimate Load Efficiency UL(Force Ratio) • And Actually My Working Load Limit My Design Factor WLL=UL(d)(e) Ultimate Load Efficiency UL(Force Ratio)Catalog WLL/(d) Vendor Design Factor • OrWLL=(Catalog WLL/Vendor Design Factor)(Force Ratio)(Design Factor)(Efficiency) But I can’t remember ever using precisely that formula. • Terms• WLL – Working Load Limit – Safe Working Load – Maximum Allowed Force – A derived strength value based on the Ultimate Load and the Design Factor • Terms• UL – Ultimate Load – Failure Load – Minimum Failure Load – Breaking Strength – Minimum Breaking Strength – The applied force that causes failure • Terms• Design Factor – Safety Factor “saferty factor”• A mathematical value applied to provide appropriate capacity for unknown influences• Usually expressed as a ratio, i.e. “10:1” • Terms• Efficiency• The nature of the application may require the load capacity to be reduced• Some things that change efficiency – D/d Ratio – Type of termination • Terms• Force Ratio• The nature of the application may require the applied load to be increased• Something causing a force ratio – Accelerations • 16 FPM Chain hoists add 25% on stop and start • Work In Steps• Remember – Is this really the load? Nod32 fix v1 9 nsaneforum.

Free Project Templates for Vegas Pro Here you will find our growing library of free projects & templates for Vegas Pro that suit a variety of uses. Enjoy, and let us know what you think in the comments below! Right now there is a bit of templates to choose from, but more projects will continue to be added over time. Intro free templates sony vegas. You can download them and use in all types of productions.

Rigging

– Do I get full capacity? – Am I comparing apples & apples • Apples = Breaking Strength • Oranges = Vendor Working Load Limit • Peaches = My Working Load Limit – Do Not Exceed Vendor Working Load Limit • Work In Steps• To derive your WLL for a given component – Multiply UL by your Design Factor • Include efficiency calculation if necessary• To find UL – Look it up in the vendor information – Multiply vendor WLL by their Design Factor • Example• If the catalog WLL of a given ¼” screw pin anchor shackle is ½ Ton, what is the maximum applied force I can apply using a 10:1 Design Factor? • Example• ¼” Shackle has a WLL of 1/2t or 1000#• If you follow the asterisk you see this:• “Maximum Ultimate Strength is 6 times the Working Load” • Example• Vendor WLL=1000#• Vendor Design Factor = 6:1 Strip their design• Ultimate load = 6000# factor to get to breaking strength and then apply our more conservative• My Design Factor = 10:1 design factor to get to our WLL.• My WLL= 6000#/10• My WLL= 600# • Example• What is the maximum load I can apply to a sling of ¼” 6x19 IWRC Cable terminated at each end with wire rope clips used in a “basket” over a 1 ½ Schedule 40 pipe.

Related Post